Concrete Driveway Installation
Having a solid concrete driveway adds beauty, security and convenience to your property. At Ottawa Concrete Repair, we are experts in concrete driveway installation with many satisfied customers across the region.
Whether you want to install a brand-new concrete driveway or replace a worn-out one, Ottawa Concrete Repair is a top choice. We use the latest methods, the best materials and the right equipment to install driveways that stand up to the harsh winters of the Great White North.
From planning to site preparation, installation and finishing, Ottawa Concrete Repair will be with you each step of the way. Call us today to learn more about how we can help you with concrete driveway installation!
How Concrete Driveway Installation Works
Step 1: Driveway Prep
First, we’ve got to get your property ready to have a driveway installed. This means demolishing the old driveway or clearing a path in raw land.
Next, a strip is graded to ensure proper drainage. Then, we install a gravel sub-base and compact it. Finally, we install a wire mesh that will create structural support for the concrete.
Step 2: Concrete Pouring
We begin to pour the concrete on the length of the driveway. At this time, our team lifts the wire mesh so it ends up in the middle of the concrete where it provides the most support.
After the concrete is all poured, we bull-float it, which is where we glide a long, flat blade of metal over the top to flatten it and push down bigger pieces of aggregate.
Then, the concrete has to sit until the water evaporates off the top. Next, we cut joints into the driveway that allow for expansion and contraction without cracking.
Step 3: Finishing
To finish the concrete driveway, we hand-smooth it with a trowel. We can do a broom finish at this point, too.
After a few days, we remove the concrete forms and make saw cuts. Under ideal conditions, the concrete needs a week to cure before cars can drive on it.
Optionally, concrete driveways can be sealed to protect them from water and deicers. This step can be done 24 hours after the concrete dries.